BDO Annual Electrical Preventive Maintenance
Greenhills Building 1
Roof Deck
Roof Deck
3.5KVA Transformer Testing
3.5KVA Transformer Testing
Electrical Room
Electrical Room
2nd Floor Server Room
2nd Floor Server Room
UPS Room
UPS Room
Transformer Testing
Transformer Testing
Greenhills Building 2
Panel Preventive Maintenance
Panel Preventive Maintenance
Meter Center
Meter Center
Fourth Floor
Fourth Floor
Third Floor
Third Floor